California Water and Power Corporation
1470 Enea Circle Suite #300
Concord, Ca 94520
Fall River Mills (2) 1.5 MW(AC)
The Fall River Mills project consists of 2 phases. Each
phase has a planned 1.5 Megawatt solar installation.
Each phase of the project is going to be under
seperate PPAs and will have seperate interconnections